Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office
Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office
Development of a Multi-User Network Testbed for Wide-Area Monitoring and Control of Power Systems CX(s) Applied: A9, B3.6 Date: 05/29/2013 Location(s): North Carolina Offices(s): National Energy Technology Laboratory
Load Control System Reliability CX(s) Applied: A9 Date: 05/29/2013 Location(s): Wyoming Offices(s): National Energy Technology Laboratory
CX-010708: Office of Secure Transportation Vehicle Maintenance Facility Improvements (CX-ORR-13-005)
Office of Secure Transportation Vehicle Maintenance Facility Improvements CX(s) Applied: B2.1, B2.2, B2.5, B4.6 Date: 05/29/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Installation Support of Supplemental Ventilation at Tank 15 CX(s) Applied: B2.5 Date: 05/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Salt Disposal Unit 2/Vault 4 Grout Line Diverter Valve with Spool Piece CX(s) Applied: B1.3 Date: 05/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Scaled Saltstone Facility Testing CX(s) Applied: B3.6 Date: 05/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida CX(s) Applied: B3.1, B6.1 Date: 05/28/2013 Location(s): Florida Offices(s): Legacy Management