Simulant Studies for Hanford Recycle Solutions CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Use of an Accurate Domain Name System Method to Derive, Validate and Supply Constitutive Equations for the Multiphase Flow with Interphase eXchanges Code CX(s) Applied: A9 Date: 06/03/2013 Location(s): Texas Offices(s): National Energy Technology Labo...
An Integrated Study on a Novel High Temperature High Entropy Alloy CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Louisiana Offices(s): National Energy Technology Laboratory
An Integrated Study on a Novel High Temperature High Entropy Alloy CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Louisiana Offices(s): National Energy Technology Laboratory
Boulder Smart Grid City - Plug-In Electric Hybrid CX(s) Applied: B5.1, B5.16 Date: 06/03/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Gila Knob Transmission Line Crossarm Replacement at Structure 18/3 CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
Boulder Smart Grid City - Plug-In Electric Hybrid CX(s) Applied: B5.1, B5.16 Date: 06/03/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory