Ammonothermal Bulk Gallium Nitride Crystal Growth for Energy Efficient Lightning and Power Electronics CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): California Offices(s): Advanced Research Projects Agency-Energy
Idalia Substation Grounding and Drainage Improvements CX(s) Applied: B4.6 Date: 05/22/2013 Location(s): Missouri Offices(s): Southwestern Power Administration
N-Area Temporary Asbestos Storage Containment Area CX(s) Applied: B6.6 Date: 05/22/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Defense Waste Processing Facility Precipitate Reactor Feed Tank (PRFT) Sample Analysis CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Large Scale Screening of Low Cost Ferritic Steel Designs for AUSC Boiler CX(s) Applied: A9 Date: 05/22/2013 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Integrated Computational Materials Engineering (ICME) Development of Advanced Steel for Vehicles CX(s) Applied: A9 Date: 05/22/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Texas Alternative Fuel Vehicle Pilot Program CX(s) Applied: A1, B5.1 Date: 05/22/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Analytical Sample Preparation Laboratory CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
High Temperature Laboratory CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05/22/2013 Location(s): Missouri, Missouri Offices(s): Southwestern Power Administration