Evaluation of High Capacity Cells for Electric Vehicle Applications CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): China Offices(s): National Energy Technology Laboratory
Evaluation of High Capacity Cells for Electric Vehicle Applications CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Metal Oxide/Nitride Heterostructured Nanowire Arrays for Ultra-Sensitive and Selective Sensors CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Rocky Ridge Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/31/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration