Removal of Heat Exchangers and Associated Piping from Disassembly Roof CX(s) Applied: B2.5 Date: 07/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Radioactive Simulant Tests for Office of River Protection CX(s) Applied: B3.6 Date: 07/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
“Clean Start” – Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 06/28/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Replace Big Hill Circuit Breakers OCB-4009, 4010 and 4011 CX(s) Applied: B1.33 Date: 06/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
South Table Mountain Visitor Center Upgrade CX(s) Applied: B3.14 Date: 06/28/2013 Location(s): Colorado Offices(s): Golden Field Office
Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Optimization Project Area #2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06/28/2013 Location(s): Wyoming Offices(s): RMOTC