Categorical Exclusion (CX) Determinations By Date

Archer Substation Microwave Building Fiber Optic Installation CX(s) Applied: B4.7 Date: 04/29/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): CX: none Offices(s): National Energy Technology Laboratory
2014 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration