Fiscal Year 2014 Communication Site Engine Generator Replacements CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Oregon, Oregon, Washington, Oregon Offices(s): Bonneville Power Administration
Doniphan Substation Backup Station Service Project CX(s) Applied: B4.6 Date: 05/05/2014 Location(s): Missouri Offices(s): Southwestern Power Administration
Design of SC Walls and Slabs for Impulsive Loading - Purdue University CX(s) Applied: B3.6 Date: 05/05/2014 Location(s): Idaho Offices(s): Nuclear Energy
Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Solar Energy Parking Canopy Demonstration Project CX(s) Applied: A9, B1.15, B5.16 Date: 05/05/2014 Location(s): California Offices(s): Golden Field Office
Final Rule for Amended Energy Conservation Standards for Walk-in Coolers and Walk-in Freezers CX(s) Applied: B5.1 Date: 05/02/2014 Location(s): CX: none Offices(s): Golden Field Office
Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Maintenance activity to clean/ unplug Outfall H-16 Diffuser at Upper Three Runs Creek (UTRC) CX(s) Applied: B1.3 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare TRU Pad 16 for RCRA Closure CX(s) Applied: B6.1 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-K CX(s) Applied: B1.3 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office