Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/18/2013 Location(s): New York Offices(s): National Energy Technology Laboratory
Analytical Sample Preparation Laboratory CX(s) Applied: B3.6 Date: 07/18/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Green Gasoline from Wood using Carbona Gasification and Topsoe TIGAS Processes CX(s) Applied: A9, B3.6 Date: 07/18/2013 Location(s): Illinois, Texas Offices(s): Golden Field Office
Regional Algal Feedstock Testbed Partnership CX(s) Applied: A9, B3.6 Date: 07/18/2013 Location(s): Arizona Offices(s): Golden Field Office
Retrofits of K-12 Schools CX(s) Applied: B5.1 Date: 07/18/2013 Location(s): Alabama Offices(s): Golden Field Office
Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Generic CX Determination for Financial Assistance Awards CX(s) Applied: Unknown Date: 07/17/2013 Location(s): Illinois Offices(s): Chicago Office
Building 4 Ventilation Upgrades CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy
Pittsburgh Site Wide Exterior Door Repair/Replacement Project CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory