Non-Newtonian Multiphase Laboratory CX(s) Applied: B3.6 Date: 04/28/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Mixed Waste Management Facility Cap Drainage Repairs CX(s) Applied: B6.1 Date: 04/28/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process CX(s) Applied: A9, A11, B3.6 Date: 04/28/2014 Location(s): New Mexico Offices(s): National Energy Technology Laboratory
A Portable, Two-Stage, Antifouling Hollow Fiber Membrane Nanofiltration Process CX(s) Applied: A9, A11, B3.6 Date: 04/28/2014 Location(s): New Mexico Offices(s): National Energy Technology Laboratory
High Pressure Immersion and Reactive Transport Laboratory CX(s) Applied: B3.6 Date: 04/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): CX: none Offices(s): National Energy Technology Laboratory
Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Curecanti-Lost Canyon 230-Kilovolt Reconductoring Project CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
John Day Powerhouse-John Day Number 1-4 Conductor Replacements CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Lusk Rural Communications Building Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 04/25/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region