Smart Cementing Materials and Drilling Muds for Real-Time Monitoring of Deepwater Wellbore Enhancement CX(s) Applied: A9, A11, B3.6, B3.7 Date: 04/15/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Lease Extension for the Existing Leased Space for the Office of the Chief Financial Officer CX(s) Applied: B1.15, B1.24 Date: 04/15/2014 Location(s): California Offices(s): Berkeley Site Office
Fiberglass Pipe Pressure Cycle Testing at 723-A CX(s) Applied: B3.6 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Glycolate and New Guanidine Solvent Testing for MCU CX(s) Applied: B3.6 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of ignition sources, cable, and conduit in the 292-H Central Exhaust HEPA Room CX(s) Applied: B2.5 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repackage Lead Shot CX(s) Applied: B6.1 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Kesselring Site Crafts Facility Building 118 CX(s) Applied: B1.15, B1.31, B1.33 Date: 04/14/2014 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Install Two Sheds in the Portable Equipment Commodity Management Center (PECMC) Yard Located in Central Shops (N-Area) CX(s) Applied: B1.15 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tacoma-Raver Access Road Easement Exchange CX(s) Applied: B1.24 Date: 04/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration
192-2K Fire Pumps CX(s) Applied: B1.3 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office