Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line CX(s) Applied: B4.11 Date: 06/21/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Utilization of Savannah River Site Surface Waters for Wildland Fire Fighting on SRS CX(s) Applied: B3.2 Date: 06/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Reduced Cost Bond Layers for Multi-Layer Thermal/Environmental Barrier Coatings CX(s) Applied: B3.6 Date: 06/20/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Big George Substation Access Road Snow Prevention, Park County, Wyoming CX(s) Applied: B1.11 Date: 06/20/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky...
Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
M1 a and b Habitat Enhancement Project, Site 300 CX(s) Applied: B1.20 Date: 06/19/2013 Location(s): California Offices(s): Lawrence Livermore Site Office
M2 Pool Habitat Enhancement Project, Site 300 CX(s) Applied: B1.20 Date: 06/19/2013 Location(s): California Offices(s): Lawrence Livermore Site Office
Routine Administrative, Maintenance, and Operating Activities at Pantex Plant for 2014 and2015 CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Texas Offices(s): Pantex Site Office