Technology Integration Program - Field Trial Site Two - Eagle Ford Shale, DeWitt County, Texas CX(s) Applied: A9, B3.1, B3.6 Date: 06/19/2013 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Development of Gas Pressurized Stripping Process for Carbon Dioxide Capture from Post-Combustion Flue Gases CX(s) Applied: B3.6 Date: 06/19/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production... CX(s) Applied: B3.7 Date: 06/19/2013 Location(s): California Offices(s): National Energy Technology Laboratory
Vista View Fields Land Acquisition CX(s) Applied: B1.25 Date: 06/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Development of ASTM Standard for SiC-SiC Joint Testing - General Atomics CX(s) Applied: B3.6 Date: 06/19/2013 Location(s): Idaho Offices(s): Idaho Operations Office
Municipal Building Geothermal and Heating, Ventilation and Air Conditioning- City of Oregon, Ohio CX(s) Applied: A9, B2.1, B5.19 Date: 06/18/2013 Location(s): Ohio Offices(s): Golden Field Office
Recovery Act: State Geological Survey Contributions to the National Geothermal Data System CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): Arizona Offices(s): Golden Field Office
Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office