Subcontractor Repair of Roof Leaks at 709-1G CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3 Date: 03/11/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
2H Evaporator Scale Dissolution Studies CX(s) Applied: B3.6 Date: 03/10/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Snowy Range-Happy Jack 115-Kilovolt Transmission Line Structure Replacements CX(s) Applied: B1.3 Date: 03/10/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
221-18H Air Conditioning, Exhaust Fan, Receptacles CX(s) Applied: B2.1 Date: 03/07/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Urban Transmission Line Hazard Tree Management CX(s) Applied: B1.3 Date: 03/06/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Deering Lake and Yuma Substation Upgrades CX(s) Applied: B4.6 Date: 03/06/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Installation of New 208 Voltage Alternating Current Electrical Service for 707-C CX(s) Applied: B1.3 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Ductwork Modifications to Limit a Ground-Level Release CX(s) Applied: B2.5 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Derailed Relocation Outside L-Area Reactor Inner Fence CX(s) Applied: B1.13 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office