Enhanced Wind Resource Assessment with Sonic Ranging and Detection at Tooele Army Depot CX(s) Applied: A9, B3.1 Date: 04/24/2014 Location(s): Utah Offices(s): Golden Field Office
Subcontractor Repair of Roof Leaks at 766-H, Room 2121 CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Perform Hydrant Flushing, Maintenance, Prove Curb Valves, and Flow Test in C-Area CX(s) Applied: B1.3 Date: 04/23/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Yakima Training Center Wind Resource Assessment CX(s) Applied: A9, B3.1 Date: 04/23/2014 Location(s): Washington Offices(s): Golden Field Office
Subcontractor Repair of Roof Leaks at 218-1H CX(s) Applied: B1.3 Date: 04/23/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hatwai Substation Bay 4 Equipment Acquisition CX(s) Applied: B1.24 Date: 04/22/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Danger Tree Management on Craig to Hayden 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/21/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station CX(s) Applied: B4.7 Date: 04/21/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers CX(s) Applied: B1.24 Date: 04/21/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Deepwater Reverse-Circulation Primary Cementing CX(s) Applied: A9, A11, B3.6 Date: 04/21/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory