Casper-Red Butte Tap License Outgrant and Fiber Optic Installation Natrona County, WY CX(s) Applied: B4.9Date: 04/06/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region
Demolish and Dispose of Shed Located East of Test Reactor Area-607 CX(s) Applied: B1.23Date: 04/03/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Pressurized Testing of Solid Oxide Fuel Cells CX(s) Applied: A1, A9Date: 04/03/2015 Location(s): Rhode IslandOffices(s): National Energy Technology Laboratory
Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.3, B1.13Date: 04/03/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
Production of Nanostructured Core/Shell Powders for Exchange Spring Magnet Applications CX(s) Applied: B3.6Date: 04/02/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Reducing BOS costs, improving reliability, and enabling safety shutdown of solar installations through module-integrated electronics Award Number: DE-EE0006682 CX(s) Applied: A9, B3.6, B5.16 Solar Energy Technologies Office Date: 04/02/2015 Loc...
Innovative Non PGM Catalysts for CHP Relevant Proton Exchange Membrane Fuel Cells Award Number: DE-EE0006965 CX(s) Applied: B3.6, B3.15 Fuel Cell Technologies Office Date: 04/02/2015 Location(s): MA Office(s): Golden Field Office
Meta-Cooling Textile with Synergetic Infrared Radiation and Air Convection for Bidirectional Thermoregulation CX(s) Applied: B3.6Date: 04/02/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
STM FTLB to Mesa Top Waterline Repair; NREL Tracking No. 15-015 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 04/02/2015 Location(s): CO Office(s): Golden Field Office
MRCSP Phase III Subtask 1.6.2 Pattison Trust #1-D Well Characterization CX(s) Applied: A9, B3.1, B3.7Date: 04/02/2015 Location(s): OhioOffices(s): National Energy Technology Laboratory