Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II CX(s) Applied: B3.6 Date: 04/04/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Carbon Dioxide Shuttling Thermochemical Storage Using Strontium Carbonate CX(s) Applied: A9, B3.6 Date: 04/04/2014 Location(s): Florida Offices(s): Golden Field Office
The Future of China's Solar Industry and Its Implications for Energy Strategy Globally and in the United States CX(s) Applied: A9 Date: 04/03/2014 Location(s): California Offices(s): Golden Field Office
Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
2H Evaporator Antifoam Effectiveness Testing/Evaporator Sample Foaming and Solubility Studies CX(s) Applied: B3.6 Date: 04/03/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Building 4 FSARS CX(s) Applied: B1.3 Date: 04/02/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Novel Ceramic Membranes for the Efficient Utilization of Natural Gas CX(s) Applied: B3.6 Date: 04/02/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration