Subcontractor Repair of Roof Leaks at 703-1B CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 720-H CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Catalyst Synthesis CX(s) Applied: B3.6 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Roof Removal and Replacement at +34 and +38, K-Area Materials Storage Building CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Archer-Cheyenne North/South 115-kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 03/18/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 717-K CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Vapor Space Corrosion Testing of Carbon Steel CX(s) Applied: B3.6 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
HB-Line Security Upgrades CX(s) Applied: B1.3 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Novel Electrolytes Via Compressed Gas Solvent for Higher Voltage CX(s) Applied: B3.6Date: 03/14/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy