Critical Infrastructure Test Range Complex (CITRC) High Frequency Test Bed Expansion CX(s) Applied: B1.15Date: 03/02/2016 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
March 2, 2016Critical Infrastructure Test Range Complex (CITRC) High Frequency Test Bed Expansion
CX(s) Applied: B1.15
Date: 03/02/2016
Location(s): Idaho
Offices(s): Nuclear Energy
Revision 1- The original Environmental Checklist (EC) was completed in advance of completed drawings and plans. This EC identifies minor changes to the dimensions of the road and asphalt pad, occasional and temporary use of a mobile generator, addition of a pole mounted solar panel, and occasional and temporary use of a mobile restroom trailer.