Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14) CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Structure and Debris Removal from Howes and Bird's Eye View Properties CX(s) Applied: B1.23 Date: 04/30/2014 Location(s): Montana Offices(s): Bonneville Power Administration
Energy Systems Laboratory Process Demonstration Unit Biomass Dryer Exhaust Stack Exhaustion CX(s) Applied: B1.31 Date: 04/30/2014 Location(s): Idaho Offices(s): Nuclear Energy
Connectivity Between Fractures and Pores in Hydrocarbon-Rich Mudrocks CX(s) Applied: A9, B3.6 Date: 04/29/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Vapor Space Corrosion Testing of Carbon Steel CX(s) Applied: B3.6 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 717-16K CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install One Power Pole and Three Anchors Northwest of 704-1N CX(s) Applied: B1.3 Date: 04/29/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Archer Substation Microwave Building Fiber Optic Installation CX(s) Applied: B4.7 Date: 04/29/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
OCGen Module Mooring Project CX(s) Applied: B5.25 Date: 04/29/2014 Location(s): Maine Offices(s): Golden Field Office
Keeler and Troutdale Substations Communication Equipment Additions CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration