Section E B-Block Cell Windows 10-12 Replacement CX(s) Applied: B2.1Date: 03/07/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
March 7, 2016Section E B-Block Cell Windows 10-12 Replacement
CX(s) Applied: B2.1
Date: 03/07/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The shielded cell windows are in need of restoration due to significant oil leakage causing a loss of visibility through windows, thus degrading the windows’ capability for continued use of the cell for critical mission needs.