685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3Date: 03/07/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
March 7, 2016685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections
CX(s) Applied: B1.3
Date: 03/07/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-Lake), in part to facilitate Federal Energy Regulatory Commission inspection requirements.