Metamaterials-Enhanced Passive Radiative Cooling Panels CX(s) Applied: B3.6Date: 07/16/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
NREL; International Institute for Energy System Integration (iiESI); NREL Tracking No. 15-026 Award Number: DE-AC36-08GO28308 CX(s) Applied: A9, A11 National Renewable Energy Laboratory (NREL) Date: 07/16/15 Location(s): CO Office(s): Golden F...
Engineering Clostridia For N-Butanol Production From Lignocellulosic Biomass And CO2 Award Number: DE-EE0007005 CX(s) Applied: A9, B3.6 Bioenergy Technologies Office Date: 07/16/2015 Location(s): OH Office(s): Golden Field Office
Rotor-mounted Bat Impact Mitigation System Award Number: DE-EE0007034 CX(s) Applied: A9, B3.1, B3.3 Wind Energy Technologies Office Date: 07/16/2015 Location(s): CA Office(s): Golden Field Office
Heating, Ventilation and Air Conditioning (HVAC) Upgrades at Multiple Substations and Radio Facilities CX(s) Applied: B4.6Date: 07/15/2015 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Enhancing High Temperature Anode Performance with 2° Anchoring Phases CX(s) Applied: B3.6Date: 07/15/2015 Location(s): MontanaOffices(s): National Energy Technology Laboratory
Fullerton Tap CX(s) Applied: B4.11Date: 07/15/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Wind Forecasting Improvement Project In Complex Terrain Near The Columbia River Gorge Award Number: DE-EE0006898 CX(s) Applied: A9, B3.1 Wind Energy Technologies Office Date: 07/15/2015 Location(s): CO Office(s): Golden Field Office
Facility for Advanced Accelerator Experimental Tests II CX(s) Applied: B3.10Date: 07/15/2015 Location(s): CaliforniaOffices(s): Stanford Linear Accelerator Site Office
Argonne Enterprise Data Center, ASO-CX-317 CX(s) Applied: B1.15Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office