Reduced Mode Sapphire Waveguide and Distributed Sensing System CX(s) Applied: B3.6 Date: 05/13/2014 Location(s): Virginia Offices(s): National Energy Technology Laboratory
Subcontractor Repair of Roof Leaks at 701-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Arc Flash Hazard Mitigations - Morgantown CX(s) Applied: B1.15, B2.5 Date: 05/12/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Corrosion Tests on Carbon Steel Exposed to Simulants CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nickel Treatment of Electrolytic Cells CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dye Sensitized Solar Cells (DSSC) CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Lithium Ion Battery with Integrated Abuse Tolerant Electrode Features CX(s) Applied: B3.6Date: 05/12/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
System-Cost Optimized Smart EVSE for Residential Application (New Tasks 101 and 102) CX(s) Applied: A1, A9, A11 Date: 05/12/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Pasco District Wood Pole Replacements (Multiple Lines) 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Washington, Washington, Oregon Offices(s): Bonneville Power Administration
North Bend District Wood Pole Replacements 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration