Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): CX: none Offices(s): National Energy Technology Laboratory
Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Curecanti-Lost Canyon 230-Kilovolt Reconductoring Project CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
John Day Powerhouse-John Day Number 1-4 Conductor Replacements CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Lusk Rural Communications Building Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 04/25/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Notice of Preliminary Determination of Energy Savings for ANSI/ASHRAE/IES Standard 90.1-2013 CX(s) Applied: A6 Date: 04/25/2014 Location(s): CX: none Offices(s): Golden Field Office
Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 12/10/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Pantex Lake Land Utilization CX(s) Applied: B1.11 Date: 11/05/2013 Location(s): Texas Offices(s): Pantex Site Office
Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Meter Installation at Fossil Lake Solar Project CX(s) Applied: B1.7 Date: 04/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration