This project will replace end of life HVAC equipment with new ones. …
Three Western Sector Treatment System MicroBlowers connected to soil vapor extraction wells VEW-07F, VEW-11F, and VEW-25A will be converted to Baro…
Repairing holes in sheetrock and painting the offices, Kitchen remodel, conference room Audio/Visual upgrades. Repairing water damage to offices du…
Paint fiberglass cooling water piping and pipe supports near 785-A.…
Install Megalug cap on Mud Blow off valve 76H.…
766-H Install a timer on the exhaust fan.…
713-4N Install WI-FI.…
Bonneville Power Administration (BPA) proposes to construct the Vancouver Control Center (VCC) project at the J.D. Ross Substation and Regional Ope…
BPA proposes to address transmission line impairments to ensure proper line function and perform some access road work. The locations are in proxim…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to operate a Challenger-850 aircraft and Unmanned Aircraft System…