Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g. cross …
This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
The proposed activity is to repair the grouted concrete cracks in the exterior walls of Building 772-F…
Titrations of acids and bases will be performed using a ThermoScientific Auto Titrator.…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
H-Canyon's processing of Spent Nuclear Fuel (SNF) and Non-Aluminum SNF (NASNF) fuel will require the SRNL's Nuclear and Chemical Processing (N and …
Centrifugal contactors will be installed in the existing mock-up facility in 716-4A to test for facility acceptance testing.…
Simulant waste streams will be flowed through varying solids (material, particle size, etc.) in order to measure the sorption of contaminants.…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…