Implement software algorithms that will process electric utility data and that will be demonstrated in various utility's IT systems / network. Data…
The Ensuring Energy Reliability for Rural Futures project would involve installation of Fault Indicator (FI) equipment on existing infrastructure i…
DOE has prepared a programmatic CX determination to cover the activities proposed by applicants to partner track of the ERC Prize.…
DOE has prepared a programmatic CX determination to cover the activities proposed by applicants to finance track of the ERC Prize.…
The Steering South Texas Toward Solar Success would include installing a 8 kW roof top solar demonstration on the DreamBuild affordable, modular ho…
CX-270768: Abandoned Raw Water Pipe Removal and Bank Stabilization in Little Beaver Creek 451.1a-078
This activity will remove abandoned steel piping that previously transferred water from the X-605 Sanitary Water Control House and associated wellfield, and stabilize creek bank to reduce further erosion.
WAPA proposes to replace insulators along the ODA-TCY transmission line.…
WAPA proposes to replace insulators along a portion of the HUR-TRY transmission line. To aid in this process, one helicopter landing zone was selec…
WAPA proposes replacement of insulators along the CW-RSW line and intends to use the helicopter landing zone on private property approximately 500 …
Funding will support the project's research, development, and scaling the pilot production of a 3-D ceramic solid-state lithium-metal battery techn…