Wooden pole replacement.…
Administrative and project management activities, building construction, site excavation and preparation, concrete pad installation, equipment inst…
Repaint fixed contamination at the distillation column area of 105-C.…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…
Repair 2 leaking roof drain pipes in 722-A. One is located over cube 131-F and the other is located in the radio shop room 130. …
Remove commodities connecting old Thermal Arc plasma cutter CLI No. N-717001-GSE-STE-480179-in 717-1N, prep for excess. Install new Hypertherm MAX …
The City of Lakota through Lakota Municipal Utilities will underground approximately 6.26 miles of overhead distribution line. …
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife's (ODFW's) routine operations, maintenance (O and…