The scope of this work is to develop deep eutectic solvent pairs for the separation of light isotopes of lithium and boron. …
TS/Repair Fuel Oil Heaters at Building 711-N. …
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
Routine maintenance activities and custodial services for Buildings 292-2F and 294-2F and to include associated structures during which operations …
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
The CMOSS Switchgear Electrical Power Upgrade and BMOSS Refeed Project supports shifting electrical loads due to current construction activities, future electrical capacity expansions, and upgrades various aspects of the power distribution system.
Installation of a new, redundant electrical feeder line from transmission lines on the west side of I-376 to the southern edge of the Neighborhood …
University of Kentucky Research Foundation (Lexington, KY) will (1) remove and capture volatile compounds (VCs), including organics and ammonia, pr…