The overall objective of the project is to perform a front-end-engineering and design (FEED) study for a commercial scale advanced carbon capture s…
Overhaul an existing generator unit by replacing the engine with a new engine of the same capacity. Perform engine testing prior to installation to…
Overhaul an existing generator unit by replacing the engine with a new engine of the same capacity. Perform engine testing prior to installation to…
The project will expand the existing network of fire-weather stations and wildfire detection cameras, and install AI-enabled grid monitors on feede…
Funding will support the project team's small-scale research, testing, and validation of the four ARPA-E NEXTCAR II teams to support further quanti…
Replace the exterior double doors located on the eastside of building 704-3N.…
Roof Repairs at 713-N.…
Install UW Drops in New Cubes in 704-1N Rm. 177. / Install electrical service to new cubicles.…
Installation of two tornado shelters inside N-Area. One will be West of 704-1N and the other will be South of 731-2N.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…