Testing will be performed using ruthenium, alkali and secondary metals which will be deposited onto solid palladium surfaces through electroless de…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. Hastelloy X, Haynes 25 alloy) and chemical dissolution of BeO-Fe…
This EEC covers work that is done in the High Pressure Laboratory at 723-A. The High Pressure Laboratory pressure tests and leak tests components f…
Installation of Wi-Fi in 713-N.…
Relocate and Demolish N-Area Trailers.…
Replace the 105-L Chiller Unit and system water pump per MT-LCR-2021-00002.…
The scope of this work order is to remove and replace 704-2H HVAC Unit No. 1. The electrical supply will be replaced and upgraded to 30 amps.…
284-19H/20H Replace floor tiles.…
Bonneville Power Administration (Bonneville) proposes to amend the existing Columbia River Non-Treaty Storage Agreement (NTSA) with British Columbi…
Bonneville Power Administration (BPA) proposes to interconnect a 20-megawatt (MW) solar development project to BPA’s electrical transmission system…