Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
To convert approximately 6,500 ft. and 12,500 ft. of overhead lines to underground. …
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Nucor Corporation (Nucor) in support of Phase 1 of Project HI…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road, right-of-way (ROW), and structure f…
Funding will support the project team's small-scale research and development of diode laser pumps needed for Inertial Confinement Fusion (ICF).…
The proposed action installs a new seismic station near the National Security Test Range (NSTR). The new seismic station would include a "seismic v…
Bonneville Power Administration (BPA) proposes to install a new 230kV power circuit breaker and associated power circuit breaker isolating disconne…
TRA-620 and ARA-750 are buildings that have fallen into disrepair. As a result, and in anticipation of potential future campus development projects…