This Amended Determination follows the approval of additional funding and an extended period of performance to support the project team's continued…
Bonneville Power Administration (BPA) proposes to allow Comcast Cable Communications (Comcast) to install two underground conduits for fiber optic …
Aluminum Canopy Placed Adjacent to 711-K…
Geologic characterization of a reservoir in Northeastern California, near the Nevada border. Includes drilling a stratigraphic well and a high-reso…
Replacing three manual switches and three oil circuit reclosers with SCADA remote controlled electronic reclosers…
Desktop Front-End Engineering and Design Study, project management tasks, regulatory plan development, community benefits planning, business case a…
Phase 1 will include the INSPIRE-ADS 19 algorithmic development and prototype implementation, initial evaluations under representative threat scena…
Circuit retirement, site prep, and directional boring. Conversion of ~750 linear ft of existing overhead circuit to underground. Installation of 3,…
The purpose of this project is to remove and replace approximately 300 feet of obstructed sanitary sewer pipe located along Kirk Road at the site b…
CX-032535: Precision Combustion, Inc. -- Destruction of VAM Using a Modular Catalytic Element System
This Amended Determination follows the approval of additional funds, new project team members, and new milestones to develop a redesigned modular a…