BPA proposes to repair about 3 miles of existing access roads and improve or replace 15 stream crossings along the Schultz-Raver and Rocky Reach-Ma…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Wisconsin Office of Energy Innovation for the design and installation of…
Diffuser-O2 Monitor Relocation Due to Miscoordination with Y839 Equipment…
Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…
PWC will implement advanced technologies and equipment that will support increased system visibility, the use of autonomous controls, integration o…
Reconductoring with ACCC in North Dakota to increase transmission capacity and SMART Grid capability. CYME server and software will be installed al…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
The Office of Clean Energy Demonstrations (OCED) intends to issue a solicitation titled "Pilot-scale Rapid Operational Validation of key Energy Inf…
This Amended Determination follows the approval of additional funds and new project location at Lawrence Berkeley National Laboratory (LBNL) to con…