Bonneville Power Administration (BPA) proposes to install equipment inside of a yet-to-be constructed Portland General Electric (PGE) control house…
This work involves the use a new reactor manifold in lab 154, 999-2W. The purpose of the reactor is to qualify the performance of heterogeneous cat…
This project will evaluate materials for anhydrous Hydrogen Chloride(HCl) and anhydrous Hydrogen Fluoride (HF) removal from hydrogen streams.…
General Operation and maintenance of the Radioactive Permeation System in 773A.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Buffalo (UB) for the development and fabrication o…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a prize competition known as the American-Made Industrial Energ…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Connecticut (UConn) (Storrs, CT) for the developme…
The purpose of this work is to better understand the proposed flowsheet for the discard of contaminated bulk graphite materials. …
Scope for instructions tab for all 3 tasks: Pressure switch for Fuel Pump 619-4N malfunctioned causing fuel oil to leak in the shop area at 717-3N.…
Centerra-SRS personnel would like to test fire ESS weapons in B-area prior to each Force-on-Force (FOF). Canine(K-9) Department desire to perform K…