The U.S. Department of Energy (DOE) proposes to analyze fission gas from samples of high burnup boiling water reactor spent fuel rods (BWR rods), a…
Remove existing epoxy coating from 681-3G traveling screen deck and recoat.…
The U.S. Department of Energy (DOE) proposes to analyze fission gas from samples of high burnup boiling water reactor spent fuel rods (BWR rods), a…
Cool Seal Roof 716-8B.…
Install WIFI at 735-2B.…
Update all lighting fixtures to LED throughout the facility at 716-N.…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Installation of mesh pole wraps to mitigate wildfires. …
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …