730-B Remove Lektriever in room No. 212.…
Install UW (Universal Wiring) drops for cubicle replacement in 730-1B 3RD floor.…
In preparation for the new 69 KV reroute Substation at CFA, the following modifications to the power management infrastructure will be implemented:…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe of Idaho (Nez Perce Tribe) to use fish produced through Snake River trib…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
701-4G Remove/replace flooring.…
Mass Spectrometer 20 valves A2 and M2 are leaking and need to be replaced. These valves provide argon to the MS-20 system. Though they are used for…
A new AHU is needed for the 234-H Office. Existing supply ductwork from the 234-H Office AHU needs to be disconnected and removed. Once the replace…
The proposed activity (PA) is a redesign of the existing Modular Stripper (MDST) blowers under MT-TRI-2021-00034. It redesigns the existing MDST bl…
Complete 249-8H and -9H renovations per AOW…