Evaluate and Correct 13.8KV Breaker Fault In Cubicle S2-14 at 151-2C.…
Removal of carpool shack (54-17 G) in AM and DO parking lot in N-Area.…
713-N Replace exterior door No. 7.…
Installation of UW Drops 704-1N Rm. 180.…
Installation of UW Drops 704-1N Rm. 117…
UPC sub-contractor to remediate asbestos before demolishing and removing (2) unused Handi-Houses to the C and D Landfill from the HY1 Laydown Yard.…
A 20 foot sealand/conex will be relocated from K-Area to SRPPF for use as a universal waste storage area.…
Subcontractor will provide roof repairs at 776-1A.…
The work will look at the effects of exposure to short-chain PFAS and polymeric PFAS (fluoropolymers) on nematodes using indirect and direct exposu…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Solar and Storage Industries Institute (SI2) to develop strategies, …