The proposed activity is the abandonment of six (6) F-Canyon perimeter groundwater monitoring wells (FCA 2D, FCA 9D, FCA 10A, FCA 10D, FCA 16A, and…
Office of NEPA Policy and Compliance
December 11, 2025The proposed activity is the abandonment of six (6) F-Canyon perimeter groundwater monitoring wells (FCA 2D, FCA 9D, FCA 10A, FCA 10D, FCA 16A, and FCA 16D). In addition, the scope includes the abandonment of w/replacement of one (1) F-Seepage basin monitoring well (FSB-078-B). The new replacement well is FSB-078-BR.