Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
730-4B Remove/replace cubes 1st floor Design Engineering area.…
The 233-H SCLU system will utilize silver (Ag) metal mercury (Hg) entrapment technology in the form of Hg traps to unload possible Hg contaminated …
Eagle LNG Partners Jacksonville II LLC (Eagle Maxville) filed an application (Amendment Application) with the Office of Fossil Energy and Carbon Management (FECM) on April 30, 2025, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of the Department of Energy's (DOE) regulations.
The project will convert 26kV Lateral Overhead Distribution to 26kV Underground Electrical Services. The overhead electrical conductors will be rem…
Testing will be performed in the 773-A E-wing Shielded Cells. The glass will be composed of frit, non-radioactive simulant (fabricated at 999-1W), …
Certified sealed radiological sources will be shown to radiation detection devices and the response of the device will be monitored and recorded.…
Salt simulant solutions and cementitious waste forms representative of waste forms from SRS will be prepared at 999-1W. Some waste forms may be sen…
Evaluate and correct domestic water deep wells 905-67B and 905-125B.…
741-1N Replace personnel door.…