Recipient and sub-recipients to standardize the control and communications of modular microgrids. No construction planned during project.…
We propose to continue to use the cylindrical sputtering system in our lab to study and optimize sputtered of Nb3Sn films for SRF cavities.…
Load Solvent from the 900-Series Tanks in H- area outside facilities (OF-H) into Portable Tanks for Transportation Offsite for Final Disposition…
Remove Sump Pump at TRU PAD#6 and Modify Piping.…
The scope of work will include prepping duct wall for paint, and applying paint coatings once wall has been prepped, Rev 1 The maintenance shop in …
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
This EEC supports activities post Cold and Dark status of Building 235-F. Revision 6 includes work in 701-1F, 720-F, 252-9F, and removal of perimet…
Install fault indicators onto existing powerlines.…
Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components. …
This EEC covers disconnecting commodities to seatrains 763-118N and 763-119N to prepare for relocation.…