The REPAIR Program seeks to develop natural gas transmission pipeline retrofitting technology to rehabilitate existing cast iron and bare steel pip…
The objective of this engineering scale project is to field test the transformational VeloxoTherm CO2 capture technology under natural gas flue gas…
Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
Renovations due to water intrusion in buildings 722-A, 703-46A AND 703-42A.…
Subcontractor will provide roof repairs at 703-6B.…
Subcontractor will provide roof repairs at 785-2A.…
766-H Troubleshoot/Evaluate non-working lighting in rooms 2401 and 2141.…
Install an Electric Discharge Machine (EDM) in building 234-7H (room 109) that requires a chilled water unit, electrical supply, instrument air sup…
Subcontractor will provide roof repairs at 789-2B.…
Replace Glovebox Glass Panel T125-304-N-03 in the Load Line 4 & 5 Finish glovebox under modified open glovebox maintenance (OGM).…