BPA proposes to allow WAVE Broadband to install conduit for fiber optic cable across the BPA fee-owned Keeler-Alston transmission line right-of way…
Administrative and project management activities
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope…
Award Number: DE-EE0008824, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): HI, Office(s): Golden Field Office
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope.…
Award Number: DE-EE0008843, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-IE0000116, CX(s) Applied: A9, B2.2, B5.1, Office of Indian Energy, Location(s): CA, Office(s): Golden Field Office
In 2016, Power Management identified the need to store heavy equipment indoors during adverse weather conditions. …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), conducted emergency structure replacement of Structures 35/4, 35/5, 35/6 and …
BPA proposes to relocate a wood pole structure and associated structural/electrical components (e.g. cross arms, insulators, etc.) on the Ellensbur…