To perform the work in connection with providing temporary steel to provide stability during removing and replacing the existing roof panels and purlins and installing new structural steel.
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
Approved herbicides, targeting Bahiagrass, will be applied inside/around various facility boundaries and on roadside/utility right of ways.…
The subcontractors shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to…
Award Number: DE-EE0008925, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
To perform the work in connection with new roadway stripping and installation of traffic control signage at each of the four (4) sites.
Services of Subcontractor to provide all tools, equipment, transportation, labor, supervision, and services required to perform the work in connect…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 11/6, 20/7, and 23/6 on its Alcova-M…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structure 40/5 on its Gore Pass-Hayden (GOT-HDN)…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing structure 15/7, on its Boyd-Airport (BYD-ARP) 11…