Perform work associated with this sonar services contract at all SPR sites. Tasks include providing sonar analysis software, providing sonar survey…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Gering-Wildcat (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Goshen-Torringto…
These projects and related tasks utilize the existing switchgrass field experiment at Fermilab and the other locations identified below.…
These projects and related tasks utilize the existing switchgrass field experiment at Fermilab and the other locations identified below.…
Award Number: DE-EE0009046, CX(s) Applied: A9, A11, B1.31, Advanced Manufacturing Office, Location(s): TX, Office(s): Golden Field Office
This project entails the routing of fiber optic cable from Buildings 12-75 and 12-126 to the new HE S and E site.…
To develop a process to produce rigid-board building panels using at least 55 percent by mass of coal-derived material (71 percent by mass of carbo…
The recipient will study the application of Flash Joule Heating (FJH) technology to convert different grades of coal into high-quality graphene.…
Selected vendor will recycle scrap metal from SRS.…