Install a new Uninterruptible Power Supply (UPS) system that will replace the existing 50 kVA UPS in Building 702-A, Room 113…
Two year project looking at humic acid adsorbent materials for CO2 capture. This work involves lab scale synthesis, analysis, and characterization …
Funding will support the project team's small-scale research and development activities to develop and scale up production of Natron’s Prussian blue…
Funding will support the project team's small-scale research and development activities to build, characterize, and test a new generation of…
Award Number: DE-EE0008920, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IN, Office(s): Golden Field Office
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Pressure wash and repaint safety striping around 784-7A Steam Plant.…
Inspection and Treatment of Utility Poles requiring soil disturbance within the F, N, and General Areas…
Replace Uninterruptible Power Supply (UPS), which will consist of the installation of two (2) new UPS systems, in Building 703-44A.…
A lab-scale R and D project to develop a post-combustion CO2 separation technology that produces the separated carbon as methanol.…