Award Number: DE-EE0008917, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): UT, Office(s): Golden Field Office
This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Relocate chiller to new location, inside Temporary Construction Opening (TCO) across from B209 inside Building 226-F.…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
The subcontractor shall provide all material, labor, supervision, tools, transportation, lodging and test equipment for obtaining pressurized and u…
Bonneville Power Administration (BPA) proposes to allow AT&T to upgrade its existing telecommunications facility located on a BPA-owned transmissio…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade their antennas and equipment at existing wireless sites on BPA transmis…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Bonneville Power Administration (BPA) proposes to install access restrictions to the Libby-Conkelley No. 1 transmission right-of-way (ROW) in line …