The purpose of this Environmental Checklist (EC) is to address activities at any Idaho National Laboratory (INL) facility, building or structure, e…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The purpose of this revision is to capture additional work activities (soil sampling and asbestos disturbance) and environmental aspects. A discuss…
The Life Safety System (LSS) for the Specific Manufacturing Capability (SMC) and Test Area North (TAN) is over 20 years old, and replacement parts …
The existing fence line at Kalispell Substation is incomplete. The main gate is missing, so the public can walk up or drive up to the control house…
AT&T proposes to upgrade their wireless communications infrastructure that is currently located on BPA’s existing Mt. Blyn communications tower. …
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…
Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…