The most schedule and cost effective solution for INL's future mission is to convert operation and management of existing telecommunication transpo…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
BPA proposes to remove a tree that has fallen on the 13.8-kilovolt double-circuit Big Cliff-Detroit PH 1-2 No. 1 and No. 2 transmission lines betwe…
DOE LM is proposing administrative actions related to Defense-Related Uranium Mine safeguarding activities on Abandoned Mine Lands.…
CX(s) Applied: A9, Water Power Technologies Office, Location(s): CO, Office(s): Golden Field Office
Removal of rail in 400-D Area.…
Pennsylvania State University proposes to develop and integrate a self-contained in situ ultrasound suite for assessment of part quality and materi…
BPA proposes to replace 12 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.…
BPA, USACE, and BOR propose an Amendment to the 2018 Columbia Basin Fish Accords MOAs with the Confederated Tribes of the Umatilla Indian Reservati…
The purpose of this project is to install sensors in various areas of the Nevada National Nuclear Site (NNSS) for diagnostic monitoring.…