Provide and install all materials and wiring necessary for the installation of a new fiber optic cable between 719-5N and the new PECMC yard office…
Remove damaged section of non-asbestos insulation and jacketing from abandoned steam line south of 285-H. Remaining insulation and jacketing will b…
Replace the 285-H steam driven turbine with a like-for-like replacement.…
Remove domestic water valve H-234000-DW-V-80.088 from the domestic water system by cutting brass nipples as needed per M-DCF-H-13606. Relocate stra…
Troubleshoot and repair Heating Water Circulating Pump #005 in Building 735-1B.…
Award Number: DE-EE0008831, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): AL, Office(s): Golden Field Office
NETL will develop a high temperature and high pressure reactor to simulate subsurface conditions which will allow the study and development of sens…
Award Number: DE-EE0008895, CX(s) Applied: A9, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
BPA proposes to continue funding the Pacific States Marine Fisheries Commission (PSMFC) for ongoing work on the Comparative Survival Study (CSS) in…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…