The objective of this effort is to assist the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR) with the preparation of a …
The proposed action replaces the chemical storage tanks, pumps, and controllers for the sodium hypochlorite chemical addition system within the coo…
Computer data analysis, computer modeling, project reporting. Lab work to synthesize, optimize, and test a working prototype of a membrane for sepa…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood-pole structures (including, cross arms, insulators, guy anchors, etc.)…
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
Award Number: DE-EE0008900, CX(s) Applied: A9, B3.3, B3.6, Wind Energy Technologies Office, Location(s): Mult, Office(s): Golden Field Office
Specifically, Blue Water Fuels seeks authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to 3.4 billio...
Completion of FEED study, NEPA, and permitting for 10 MWe CO2 absorption pilot at CWLP host site, TEA update, and updating costs and schedules for …
BPA proposes to install electrical equipment in BPA’s Rock Creek Substation in Klickitat County, WA in order to interconnect Avangrid’s planned Lun…
This task will remove and replace asbestos tile, cabinets, and ice machine. Construction personnel will also paint and repair walls in Building 703…