Subcontractor shall furnish all tools, equipment, transportation, labor, and supervision, required to perform the work in connection with the Janit…
Bonneville Power Administration (BPA) proposes to provide funds to the Confederated Tribes and Bands of the Yakama Nation (Yakama Nation) for resto…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The structure identified for demolition is the X, Y, and Z Wings of building 202 (XYZ Wing). …
DOE LM is proposing to transfer the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex South, New Jersey, Site to the Borough of Mi…
Crystalline compounds of enriched uranium (U-235) will be fabricated via recrystallization of commercial compounds (uranyl nitrate and acetate) wit…
Inspection and/or treatment of currently installed utility poles in E Burial Ground area…
This activity is to evaluate and correct lighting fixtures throughout various buildings in F-Area.…
"The modification is being implemented to support the ""Layup"" plan to safely isolate or remove Structures, Systems, and Components (SSCs) no long…
Award Number: DE-EE0008166, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CO, Office(s): Golden Field Office