Bonneville Power Administration (BPA) proposes to replace and relocate existing potential transformers (PTs), modify an existing concrete footing, …
This work scope is to set-up and operate a newly procured rope saw on the test wall at 666-E prior to utilizing in various areas across the site. T…
Due to a recent assessment of the air surveillance program at SRS, it has been decided to build a new air surveillance station to ensure thorough s…
Remove Portable Building 663-45G from service/use and excess it for transfer to SRS Community Reuse Organization (SCRO). A new building of the same…
241-280H Replace Manway on Tanks 01 & 02 and remove existing gaskets.…
Removal and proper disposal of 2 fume hoods located in Room 112 of building B25. The fume hoods have asbestos containing panels. …
Bonneville Power Administration proposes to allow Clark County Public Works to remove the existing sidewalk ramps on the north side of the intersec…
This activity is to evaluate and correct lighting fixtures throughout Building 706-4F.…
Remove all coatings down to the original concrete floor in Room 16 of Bldg. 705-N.…
The National Wildfire Coordinating Group (NWCG) requires the Idaho National Laboratory (INL) fire department to have chainsaw packages on Type 4 wi…