Repaint and black out sections of parking lot.…
Utilities Service Alliance, in collaboration with Idaho National Laboratory (INL), Vistra Energy, Talen Energy, Energy Northwest, and Xcel Energy, …
To promote goals in the Idaho National Laboratory (INL) Sustainability Plan, the proposed action installs electric vehicle charging stations, mount…
Bonneville Power Administration (BPA) proposes to allow PBS Engineering and Environmental, Inc. (PBS) on behalf of the City of Vancouver to conduct…
Perform repairs to Building 719-5N.…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…
772-F domestic water outlet isolation valve is leaking. In order to repair domestic water line near regulator, the presumed asbestos containing mat…
Award Number: DE-EE0008844, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): OR, Office(s): Golden Field Office
Replacement of AHU-B and AHU-C at 292-F. This will include disposal of old Air Handling Units.…