This environmental checklist is being revised as a 1st tier document to address activities at Boise State University (BSU) that are not covered in …
Develop/fabricate wireless microsensor-based downhole temperature/pressure sensing system. Demonstrate feasibility in two 5k-6k ft deep legacy bore…
Award Number: DE-EE0008812, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): FL, Office(s): Golden Field Office
Award Number: DE-EE0008810, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): FL, Office(s): Golden Field Office
BPA proposes to perform routine maintenance along the access roads and structure spur roads of the Paul-Olympia No. 1 transmission line, between st…
Award Number: DE-EE0008837, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office
UT will conduct a field laboratory validation of a sensor system that provides data at UT’s Devine Geophysical Test Site.…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…